Atatürk Üniversitesi Atatürk Üniversitesi
Ara
Yayınlara dön
Makale Tam Makale Uluslararası 2014

A solution approach to a synchronisation problem in a JIT production system

Emin Gundogar, Aysegul Yilmaz, Burak Erkayman

Production Planning and Control Cilt 25 · Sayı 12 · ss. 990–998 · 10.09.2014
DOI ile aç

Anahtar kelimeler

MANAGEMENT REDUCTION PERFORMANCE production system synchronisation line stoppage cycle time root-cause analysis JIT JUST-IN-TIME TOYOTA PRODUCTION SYSTEM MODEL ASSEMBLY-LINE SEQUENCING PROBLEM WAFER FABRICATION KANBAN SYSTEM

Atıf için künye

Gundogar, E., Yilmaz, A., & Erkayman, B. (2014). A solution approach to a synchronisation problem in a JIT production system. Production Planning and Control, 25(12), 990–998. https://doi.org/10.1080/09537287.2013.794984

BibTeX
@article{gundogar2014-182048,
  author = {Gundogar, Emin and Yilmaz, Aysegul and Erkayman, Burak},
  title = {A solution approach to a synchronisation problem in a JIT production system},
  journal = {Production Planning and Control},
  year = {2014},
  volume = {25},
  number = {12},
  pages = {990--998},
  issn = {0953-7287},
  doi = {10.1080/09537287.2013.794984},
  url = {https://akademik.atauni.edu.tr/yayinlar/182048-a-solution-approach-to-a-synchronisation-problem-in-a-jit-production-system}
}